This is an archive of requests from 2013 to 2021. New requests are not being added here.
PROM Request Title PROM Date PROM Request Summary Equipment List PROM Decision
Standard operating procedure for liquid electrochemical cell 06/09/2021 (all day) Request for group to purchase liquid electrochemical cell for Woollam, and documentation of procedures for installation and un-installation Request approved.
HD4110 photoresist and Cyclopenanone in SNF 06/04/2021 (all day) Request for new resist and solvent in SNF. Request approved.
TDUR Photoresist Use in SNF 06/03/2021 (all day) Request for new resist in SNF labs. Request approved. Please see process staff for details.
Request for use of hydrogel-based photoresist (NIPAM) 05/25/2021 (all day) Request for new resist formulation in SNF Request approved.
Nitric Acid and Sulfuric Acid for Oxygen Termination of Diamond 05/20/2021 (all day) Request for heated acid manual processing. Request approved.
Savannah Al2O3 ALD on samples with exposed BiFeO3 and SrRuO3 05/17/2021 (all day) Request for non-standard materials in Savannah. Savannah ALD (savannah) Request approved. Please see process staff for details.
PT-DSE etching of silicon to undercut lithium niobate structures 05/13/2021 (all day) Request documenting data collection to enable LiNb processing on PT-DSE Request approved
70-nm-thick Al2O3 ALD deposition by Fiji-1 in SNF 05/13/2021 (all day) Request for depositon that is thicker than allowed. Request approved.
Returning Si/SOI (Si-on-insulator) to Clean Group for CMOS FEOL after UV 05/04/2021 (all day) Cleanliness category exception documented. Request approved. Please see process staff for details.
Stress Testing with temperature cycling 05/04/2021 (all day) Request to use the temperature capabiities of the Flexus. Flexus 2320 Stress Tester (stresstest) Request approved.

Pages