| Equipment name & NEMO ID | Training Required & Charges | Cleanliness | Location | Notes |
|---|---|---|---|---|
|
Tystar Bank 1 Tube 1 Anneal B1T1 Flexible Oxide |
Tystar Atmospheric Tube Training | Flexible | SNF Paul G Allen L107 Cleanroom | |
|
Tystar Bank 1 Tube 2 B1T2 Flexible Oxide |
Tystar Atmospheric Tube Training | Flexible | SNF Paul G Allen L107 Cleanroom | |
|
Tystar Bank 2 Tube 5 B2T5 Clean Anneal |
Tystar Atmospheric Tube Training | Clean | SNF Paul G Allen L107 Cleanroom | |
|
Tystar Bank 2 Tube 6 B2T6 Clean Oxide |
Tystar Atmospheric Tube Training | Clean | SNF Paul G Allen L107 Cleanroom | |
|
Tystar Bank 3 Tube 9 B3T9 Clean Oxide |
Tystar Atmospheric Tube Training | Clean | SNF Paul G Allen L107 Cleanroom |