Wet Bench Clean_res-piranha wbclean_res-piranha |
Wet Bench Clean Piranha/HF/Phosphoric Training |
Clean |
SNF Paul G Allen L107 Cleanroom |
Resist will be removed |
EVG 101 Spray Coater evgspraycoat |
Spray Coater EVG 101 Training |
"All" |
SNF Paul G Allen L107 Cleanroom |
Spray coating of resists |
Technics Asher technics |
Technics Asher Training |
Flexible |
SNF Paul G Allen L107 Cleanroom |
|
Tystar Bank 1 Tube 4 LTO B1T4 Flexible LTO |
Tystar LPCVD Tube Training |
Flexible |
SNF Paul G Allen L107 Cleanroom |
|
AMAT Centurion Epitaxial System epi2 |
Epitaxial AMAT Centurion Training |
Clean |
SNF Paul G Allen L107 Cleanroom |
N and P doping available- intrinsic to 5E19 Operating pressure range is 5-300Torr |
Wet Bench Flexcorr 3 wbflexcorr-3 |
Wet Bench Flexcorr 1and2 and 3and4 Training |
Flexible |
SNF Paul G Allen L107 Cleanroom |
Manual wet etching of non-standard materials using acids or bases. Hot Plate available. GaAs not allowed. |
SVG Resist Coat Track 1 svgcoat |
SVG Resist Coat Tracks 1 and 2 Training |
"All" |
SNF Paul G Allen L107 Cleanroom |
Automatic Resist spinning and bake |
Prometrix Resistivity Mapping System prometrix |
Prometrix Training |
"All" |
SNF Paul G Allen L107 Cleanroom |
3 Probe Heads for different cleanliness groups. |
Samco PC300 Plasma Etch System samco |
Samco Training |
Flexible |
SNF Paul G Allen L107 Cleanroom |
|
Tystar Bank 3 Tube 11 TEOS B3T11 Clean TEOS |
Tystar LPCVD Tube Training |
Clean |
SNF Paul G Allen L107 Cleanroom |
|
PlasmaTherm Shuttlelock PECVD System ccp-dep |
PlasmaTherm Shuttlelock PECVD System Training |
"All" |
SNF Paul G Allen L107 Cleanroom |
To maintain cleanliness level, cleans of both the chamber and wafers are required prior to processing -
Substrates in clean category: Pre-Diffusion Clean
For semi-clean substrates: Standard Metal Clean (SRS100 + PRS1000) . Run Chamber clean (no dummies) and conditioning with clean dummies prior to run |
Wet Bench Flexible Solvents wbflexsolv |
Wet Bench Flexible Solvents 1 and 2 Training |
Flexible |
SNF Paul G Allen L107 Cleanroom |
Manual solvent cleaning of substrates or resist removal. |
SPTS uetch vapor etch uetch |
SPTS uetch vapor etch Training |
"All" |
SNF Paul G Allen L107 Cleanroom |
Pieces need a carrier wafer; Isotropic Etching |
Flexus 2320 Stress Tester stresstest |
Stress Tester Flexus 2320 Training |
"All" |
SNF Paul G Allen L107 Cleanroom |
|
Lesker2 Sputter lesker2-sputter |
Sputter Lesker 1&2 Training |
Semiclean |
SNF Paul G Allen L107 Cleanroom |
reactive O2/N2 sputtering, substrate bias, substrate heating, co-sputter |
Tystar Bank 2 Tube 8 LTO B2T8 Clean LTO |
Tystar LPCVD Tube Training |
Clean |
SNF Paul G Allen L107 Cleanroom |
|
PlasmaTherm Versaline HDP CVD System hdpcvd |
PlasmaTherm Versaline HDP CVD System Training |
"All" |
SNF Paul G Allen L107 Cleanroom |
To maintain cleanliness level there are cleans required for both the chamber and wafers prior to processing -
Substrates in clean category: Pre-Diffusion Clean
For semi-clean substrates: Standard Metal Clean (SRS100 + PRS1000) . Run Chamber clean (no dummies) and conditioning with clean dummies prior to run |
Critical Point Dryer Tousimis Automegasamdri-936 cpd |
Critical Point Dryer Training |
Flexible |
SNF Paul G Allen L107 Cleanroom |
CO2 drying after release of micromachined devices |
HMDS Vapor Prime Oven, YES yes |
YES Prime Oven Training |
"All" |
SNF Paul G Allen L107 Cleanroom |
Two programs: Singe and HMDS prime or Singe only. No Resist allowed! |
AJA2 Evaporator aja2-evap |
Evaporator AJA2 Training |
Flexible |
SNF Paul G Allen L107 Cleanroom |
For more than 300nm deposition, please contact Gabe Catalano <gcatalano@stanford.edu> in advance |